The Ministry of the Environment and Energy Security (MASE), through the GSE, has opened the window for granting non-repayable grants to support the construction and upgrading of renewable energy plants within the framework of Renewable Energy Communities (CER) and collective self-consumption systems, financed by the PNRR – NextGenerationEU.

Purpose

Granting of subsidies for expenses incurred for renewable energy plants (new or upgrades) included in renewable energy communities (CER) and collective self-consumption systems in municipalities with a population of less than 50,000 inhabitants.

Financial allocation

Total: €2,200,000,000 (Mission 2, Component 2, Investment 1.2 of the PNRR).

Contribution

Capital contribution of up to 40% of eligible costs.

Beneficiaries

Entities that undertake the investment for the construction/upgrading of the plant.

They must comply with the requirements set out in the Operating Rules.

Eligible interventions

New construction or upgrading of renewable energy plants (< 1 MW).

Included in CER configurations or collective self-consumption systems in municipalities with < 50,000 inhabitants.

Main eligibility criteria

Power ≤ 1 MW.

Authorisation and connection estimate (where required).

Location in a municipality with < 50,000 inhabitants and in the area of the same primary substation as the CER/Self-consumption configuration.

Start of work following the application.

Completion of work by 30/06/2026.

Commissioning within 24 months of completion of works and in any case no later than 31/12/2027.

Inclusion in self-consumption/CER configuration with active incentive tariff contract.

Eligible expenses

Construction of renewable energy plants, storage systems, grid connection, necessary construction works.

Design, surveys, works management, testing, essential consultancy (max 10% of the amount).

Cost limits per kW:

€1,500/kW (≤ 20 kW),

€1,200/kW (20–200 kW),

€1,100/kW (200–600 kW),

€1,050/kW (600–1,000 kW).

VAT is not eligible, unless it is non-recoverable.

Submission of applications

Opening date: 21/07/2025 at 3 p.m.

Closing date: 30/11/2025 at 6 p.m. (unless funds are exhausted).

Method: exclusively online via the “SPC – Production and Consumption Systems” application on the GSE portal (https://areaclienti.gse.it/).

Further information

Do you need support for your company to identify the most suitable subsidised financing instrument, submit your application and manage your reporting?

Talk to:

Silvia Marchini – marchini@polotecnologico.it – 050 754 121

Giulia Gori – gori@polotecnologico.it – 050 754 144

CONTACTS

Want to know more?

The Polo team is at your disposal to offer you information and support.

Fill out the form for more information

Don't miss out on our newsletter

Stay up to date on events, projects, initiatives, opportunities and stories related to the Innovation Ecosystem.